Aerospace AFP Foundation
HHCI furnished, placed and compacted aggregate base-rock under all new slabs /foundation for the AFP Foundation. For this project, the existing concreted was sawed and removed, then excavated per the required depths. HHCI furnished and installed steel forms with I-Beam support structure, then poured, finished, and striped the structural concrete foundation.