El Centro Maintenance Station, Road Work & Sub Shop

The new buildings for the El Centro Maintenance Station included: Building A Regional Office, Maintenance Office/Equipment Building and Aluminum Canopy, Building C Covered Storage, Building E Herbicide/Fertilizer Storage, Building F Hazardous Material Container, Building G Emulsion Tank Pad, Building I Storage Concrete Pad, Building J Warehouse, Building M Fuel Island, Building N Wash Rack, Building O Wash Rack, Pad K Electrical Transformer Pad, and Pad Q Liquefied Petroleum Gas Tank Pad

Key Work Features

  • Warehouse 3,280sf
  • Regional Office 5,762sf
  • Sub Shop 2,618sf
  • Maintenance office & Eqt 9,374sf
  • Covered Trash 6,188sf
  • Wash Rack 1,974sf
  • Herbicide storage 400sf
  • New Bldg 4,320sf
  • Approximate Project Total Square footage 31,942sf

Results

  • Major requirements included: Storm Water Pollution Prevention Plan, Injury and Illness Prevention Plan, Waste Management Plan, LEED Submittal, Welding Quality Control Plan, and Shoring Plan.
  • Extensive coordination among City of El Centro and CalTrans
  • Sustainability: Limited site disturbance, erosion control, energy-efficient equipment
  • HHCI established a schedule of activities in cooperation with the Engineer, Caltrans and City staff to mitigate construction impacts.