FWC Reservoir

As part of our emergency response services, Fontana Water Company contacted HHCI to assist on an urgent roof repair located at their Plant F10 Reservoir site in Fontana, CA. The reservoir was 17 feet high and had a diameter of 175 feet. The roof had begun to sag and was in danger of falling through. Due to the severity of the damages that could have incurred, HHCI’s team expedited the necessary tests and permits required in order to perform asbestos, lead-based paint and termite inspections. As a result, HHCI’s emergency response team was able to safely remove and replace the roof. Now the reservoir is back and running providing services for neighboring homes and facilities.

Key Work Features

  • Asbestos abatement
  • Lead-based paint testing
  • Termite inspection
  • Demolition