San Dieguito Intake Maintenance

The volume of sand HHCI removed from the inlet channel was approximately 19,000 cubic yards. The objective of this project was to excavate the sand per the cross-sections. The excavated sand was then placed on the beaches north and south of the inlet, with the majority of the sand being placed to the south. The project areas where excavation was carried out were located east of Highway 101 Bridge.

Key Work Features

  • Safety compliance
  • Phased construction in multiple sites
  • Extensive SWPPP BMP’s installed and maintained
  • Full compliance with permitting conditions with California Coastal Commission and U.S Army of Corps Engineers
  • Daily Field Reports

Results

  • Received high acclamations from nearby residents
  • Achieved 100% accident-free operations